POSTAGE
MSI Smart EV Charger EV Life
Charging gun IEC 62196-2 Type 2, Up to 7.4 kW 32A output
Plug and Play! Connect via Bluetooth to MSI EV Life EV Charger, and in less than 60 seconds, ready to
easily start charging
Compliant with RCM, CNS 15511, UL2594 and IEC 61851
Exclusive EV Life app controls your charging on the smartphone
IP55 and IK08 compliant to withstand wind and rain, suitable for indoor or outdoor application
Meet the ASTM B117 Standard, providing superior rust resistance. You can count on our chargers to thrive
in salt-air environments, such as coastal areas, for at least 3 years.
Capable of reliably operating in conditions up to 55 degreeC, ensuring consistent performance and dependable
charging even in Australias most intense heat.
WW First and only one 3000m altitude certification to ensure normal operation in high-altitude areas
Provide product liability insurance worth five million USD, covering any property damage caused by
product issues.
100pct Safety Protection
At MSI, we dont just talk the talk were serious about your safety. With a
solid five million dollars (USD) in liability insurance covering any
property damage due to product issues, were delivering a truly worry-free
charging experience. Rest easy knowing you, your car, and your home are
protected no worries.
Built Tough to weather the Elements
Rain, hail, or shine our MSI EV Charger is up for the
challenge. Designed with the Australian outdoors in mind, this
charger sports an IP55 rating for water and dust protection. So
even if Mother Nature has other plans, your charge is
guaranteed to keep going when you need it most.
Built to Last
Sure, its sleek and stylish, but the MSI EV Charger is as rugged
as they come. Thanks to IK08 impact protection, your charger is
ready to shrug off lifes bumps and bruises. With MSI,
durability meets style, meaning youll get where youre going
without any hiccups.
Superior Corrosion Resistance
Enjoy living near the beach? No worries. MSIs EV Charger is
made to survive the harshest of environments, exceeding the
ASTM B117 Rust Corrosion Resistance Standards. Whether
youre charging by the coast or in the heart of the outback, count
on us for long-lasting performance.
Extreme Heat Resistance
Australian summers can be scorching, but MSIs EV Charger
handles it with ease. Designed to withstand temperatures up to
55 degreeC in direct sunlight, it keeps your EV cool and charged when
the mercury rises. Where other chargers need a breather, MSI
keeps charging.
Plug and Play
With the MSI EV Life app, charging couldnt be simpler.
Connect via Bluetooth, control your charger, view stats, and
access advanced features, all in one place. Just plug in and enjoy
peace of mind knowing that MSIs got you covered.
Compatible with All EVs
Unlike other chargers that restrict you to certain models, MSIs EV
Charger is compatible with all EVs, whether BEV or PHEV. Were not
here to play favorites just plug in, and go. Plus, with the Type 2
charging gun, its fully compliant with Australian EV standards.
High- Reliability
MSIs industry-leading technology meets and exceeds Australian
and global standards. Backed by our liability insurance, every charge
delivers the reliability you expect and the performance you deserve.
MSI EV Life APP
Take your charging experience to the next level with the MSI EV
Life app. Enjoy features like advanced scheduling to avoid peak
rates and current control for tailored charging speeds that help
protect your EVs battery. From setup to advanced control, its
all in the palm of your hand.
UPC: 824142389270
| SKU | EVM-EV_LIFE |
| Brand | MSI |
| Shipping weight | 6.5000kg |
| Shipping width | 0.330m |
| Shipping height | 0.225m |
| Shipping length | 0.455m |
MSI Smart EV Charger EV Life
or 4 payments of $129.80 with
Learn more
Product Information
SKU:
EVM-EV_LIFE
Brand:
MSI
Shipping Weigth:
6.5000kg

